RPMI was responsible for programming, schematic and final design for a new facility for the Division of Water. The Harvard Yard is the only facility devoted exclusively to the maintenance and repair of water lines, meters, hydrants and mains for a service area containing 2,000,000 people, 545 square miles with 5,000 miles of water mains.
The facility is designed for four major departments; administration, operations, service and maintenance, and engineering and construction. Twenty acres of land will be developed with building containing 231,000 sq. ft.
|